About the Property
R-evolution Phase 4 will be developed in accordance with the Design Guide for the Advanced Manufacturing Park (AMP). Units will be finished to include the following specification:
Steel portal framed building with feature glazing to office
7.5 metre eaves height
One electronically operated 5-metre high loading door to warehouse/workshop
Dedicated car parking with large service yard to front
Car parking space ratio of 1:870 sq ft
Modern offices with WC facilities incorporated comprising minimum 10% of gross internal floorspace
Connection to all mains services
Units can be combined to accommodate larger requirements where required.
Steel portal framed building with feature glazing to office
7.5 metre eaves height
One electronically operated 5-metre high loading door to warehouse/workshop
Dedicated car parking with large service yard to front
Car parking space ratio of 1:870 sq ft
Modern offices with WC facilities incorporated comprising minimum 10% of gross internal floorspace
Connection to all mains services
Units can be combined to accommodate larger requirements where required.
Availability
Floor | Size |
---|---|
Unit 9a | 13,810 Sq Ft |
Unit 9b | 13,810 Sq Ft |
Unit 9 | 27,620 Sq Ft |